Factory-direct wall, floor and formwork panels · Linyi, China

WPC Ceiling Beam

Flame-retardant WPC Ceiling Tube 25 × 80 mm

25 × 80 mm section · interior ceiling

SKU: CEI-65FF75 SGS tested CE marked ISO 9001

Specification

Specification for Flame-retardant WPC Ceiling Tube 25 × 80 mm
Section 25 × 80 mm, supplied made to order to the run length
Fire Class B option available on this section — confirm the class the project requires
Compound Flame-retardant additive in the compound, so a site cut does not expose untreated material
Suspension Light-to-medium section: batten or direct fix, hangers at the layout spacing
Use Circulation routes and commercial ceilings where a fire class is written into the spec
Standard SGS tested. CE documentation supplied with EU-bound orders.
Maintenance Wipe clean. No paint or oil finish required.

What this product does

  1. 1
    Flame-retardant compound

    The additive is in the compound, so a site cut does not expose untreated material

  2. 2
    Class B option

    A Class B option is available on this section; confirm the class the project requires

  3. 3
    Light-to-medium section

    25 × 80 mm, fixed to batten or slab with hangers at the layout spacing

  4. 4
    Exposed on all sides

    Finished all round, so the rated tube still works as a visible beam

Description

A hollow wood-plastic ceiling tube at 25 × 80 mm, made with a flame-retardant additive carried in the compound rather than applied as a coating. It is a four-face profile, finished on all sides, so it works as an exposed beam.

It goes where a fire classification is written into the ceiling specification: circulation routes, commercial ceilings, escape routes. Having the additive in the compound rather than on the surface matters more than it sounds, because a tube is cut on site at every change of direction and a coated profile would expose untreated material at each cut. This one is formulated through the section. A Class B option is available, and the honest position is that we will confirm what can be documented for the class the project actually requires rather than quoting a classification we cannot support with paperwork — that is a conversation to have at enquiry stage, not after the order. The section, finish and colour range are the same as the standard tube, so a fire-rated run does not have to look different from the rest of the ceiling.

Send the required fire class and the ceiling layout with the enquiry, and confirm the hanger spacing at the same time, since the fixing has to suit both.

Where it is used

Escape route ceilings

The classification is written into the route, so the section has to carry it

Commercial corridor ceilings

Circulation in a public building, where a class is specified

Hotel back-of-house

Service corridors that are still inside the fire strategy

School and college circulation

Public buildings where the ceiling sits inside the compartment

See all application guides

Frequently asked

What is the minimum order?

1 × 20ft container, mixed across products where the mix suits the project. A sample box can be arranged before the first container.

Can I see a sample before ordering?

Yes. Send the product and the size you are specifying, and we will confirm the sample and the lead time for it.

Is the whole tube flame-retardant or just the surface?

The additive is in the compound, so the section itself is formulated for it rather than coated. That is the difference that matters when a tube is cut on site, because a coated product exposes untreated material at every cut.

Which fire class can you supply?

A Class B option is available on this section; tell us the class the project requires and we will confirm what can be documented for it. We will not quote a class we cannot support with paperwork.

Does the flame-retardant compound change the appearance?

No. The section, finish and colours are the same as the standard tube. The difference is in the compound.

Can it be used on an escape route ceiling?

Only against the classification that route requires, which is a decision for the project's fire engineer. Send us the requirement and we will confirm what the product can support.

Trade terms

MOQ
1 × 20ft container
Lead time
15-25 days
Payment terms
T/T 30% deposit, balance before shipment

Final packing, freight and loading plan are confirmed in writing on the order quotation.

Related products

All in this category

Technical reading

  • 50+ Countries shipped to
  • 2003 Established
  • 20,000 m² factory area
  • 20 Production lines
  • 80 Employees
  • 15 Product lines
  • 5M m² annual capacity

Ask about this product

Tell us the size, the quantity and the destination port. We will come back with price, lead time and the packing plan.

  • Reply within one business day
  • No obligation, no account needed
  • Drawings and specs stay confidential

Get My Quote

The product name and SKU are filled in for you.

Ask on WhatsApp

We reply within one business day. Your drawings and specs stay confidential.

Chat with our export team