What goes into this job

Materials and where each one is used

SPC flooring

Click-lock rigid core with an IXPE pad underfoot. It goes over an existing subfloor with no adhesive and no cure time.

Learn more SPC flooring

Wall panel

Corridor and lift-lobby walls take the most traffic. The wipe-clean surface is the reason to specify panel over painted board.

Learn more Wall panel

Acoustic ceiling

Corridors and lift lobbies are hard surfaces and reverberate. A rated panel brings the level down before it reaches the room.

Learn more Acoustic ceiling

How the job runs

Sequence on site

  1. 1

    Fix the specification before the order

    Fire rating, wear layer and emission class first. Changing any of them after the floor is laid is the expensive order to change.

  2. 2

    Acclimate the flooring

    Lay the boards in the room for the acclimation period the supplier states before clicking them down.

  3. 3

    Start from a straight reference line

    Measure once and chalk a line. The first row decides whether the last row lands square.

  4. 4

    Lay the field

    Stagger the end joints between rows. A continuous seam running down a corridor is the first thing a guest notices.

  5. 5

    Fix wall panels before the final clean

    Doing panels before the clean keeps adhesive dust out of the joints.

  6. 6

    Hand over with the paperwork

    Fire certificates, test reports and batch records belong in the handover pack.

On site

What this application looks like

hotel-fit-out — application photograph 1
hotel-fit-out — application photograph 2
hotel-fit-out — application photograph 3

Specified on this kind of job

Products used on this type of project

Technical notes

Detail worth knowing before you order

Hospitality fit-out is a repeatability problem: hundreds of identical rooms, a tight programme, and a specification the operator can afford across the whole estate. Send one room’s detail and we will quote the volume behind it.

We supply to hotel groups and to their contractors. Where the operator specifies a particular finish, we will confirm whether that finish is a stock item or a minimum-order quantity.

Other applications

Tell us about your project

Area, substrate, fire rating and target cost are enough for a first answer.

Send an inquiry

Ask on WhatsApp

We reply within one business day. Your drawings and specs stay confidential.

Chat with our export team